(33/11kV) Medium and Low Voltage Llines Manyara Region on Turnkey Basis
Construction of electricity power network in various regions of the country. Mayuge-Kaluba-Bwonda with tee-offs to Kasutaime and Bukoba.
Client: | Rural Energy Agency. |
Location: | Uganda |
EPC: | CCC International Engineering NIG LTD. |
PC: | |
Capacity: | |
Status: | On-going. |